Concept for the Phased Plan for the Introduction of BIM – Final Report

Federal Ministry for Digital and Transport (BMDV)
Dec 31, 2015

View the document

The document’s full title is Concept for the step-by-step introduction of modern, IT-supported processes and technologies in the design, construction and operation of structures – step-by-step plan for the introduction of BIM – final report (Konzept zur schrittweisen Einführung moderner, IT-gestützter Prozesse und Technologien bei Planung, Bau und Betrieb von Bauwerken – Stufenplan zur Einführung von BIM – Endbericht)

Everyone involved in the planning, construction and operation of construction projects – including public and private builders, architects, planners, software manufacturers, contractors, suppliers and operators – should have a common vision and strategy for the implementation of integrated, model-oriented working. This vision and strategy should include short- and long-term goals in the form of a step-by-step plan. This phased plan must address the weakest links in the supply chain and give the market sufficient time to prepare.

The former Ministry of Transport and Digital Infrastructure has taken up this recommendation and, based on international examples, it published a phased plan for the introduction of BIM in the transport sector, which covers the use of BIM in new projects to be planned in Germany from the end of 2020. Prior to 2020, the skills, capacities and foundations should be created through collaboration. For this purpose, BIM pilot projects have been carried out and scientifically evaluated.

At the strategic level, the step-by-step plan proposed in this final report includes a guiding approach, principles and a vision for the German construction industry in the digital age. For the operational level, the plan describes in detail an initial performance level for the application of the Building Information Modelling (BIM) method in projects. It then defines a basic reference process for the creation and transfer of digital data in construction projects. By consistently applying this process, the advantages of the method, such as increased planning security, transparency and efficiency, can be achieved in a cost-effective manner and with little risk. This final report also proposes to give the overall market sufficient advance notice of what to expect.

View the document

An archive version of this information article has been created if the original is no longer accessible (Archive information from January 2024)

Attention

The following content will be presented in English

Would you like to proceed?

This site is registered on wpml.org as a development site.